I have a little projekt and i would like to change the DutyCycle time Dependent for example the first 0-0.025 sec it should be 0.5 DutyCycle and from 0.025-0.05 sec i want a DutyCycle of 0.7 so i only have one Graph where after half the time the DutyCycle changes.
Is this possible?