|
Code Generation Error: Sample time period is not an integer multiple of the base step size
|
|
3
|
46
|
October 13, 2026
|
|
#include "user_defined_header.h" not accessible at compilation
|
|
1
|
33
|
October 9, 2026
|
|
Plecs Ti PWM Block Limitation
|
|
1
|
81
|
September 11, 2026
|
|
Redefinition error
|
|
3
|
100
|
September 4, 2026
|
|
Assistance with adapting DAB for RTBox HIL
|
|
10
|
210
|
July 31, 2026
|
|
Differential ADC for TI C2000
|
|
5
|
621
|
July 14, 2026
|
|
C-Script Blocks Prevent DSP Flashing on LAUNCHXL-F28379D
|
|
5
|
166
|
June 15, 2026
|
|
HIL with TI C2000 (28379D) + RT BOX1 – How to control two converters using TI C2000 Target Support?
|
|
3
|
159
|
June 5, 2026
|
|
Grid-Forming Inverter Stable in Offline Simulation but Unstable When Implemented in RT Box HIL Simulation
|
|
2
|
153
|
June 4, 2026
|
|
SPI C / SCI C not supported for code generation with TI2737x
|
|
1
|
64
|
May 28, 2026
|
|
Large ADC sampling error on rt_box2 – ~8 deviation from true constant value
|
|
1
|
46
|
May 28, 2026
|
|
Phase-shifted carrier PWM for cascaded H-bridge on C2000 + RTBox HIL
|
|
2
|
181
|
May 16, 2026
|
|
PLECS 4.9.5 compatibility with PLECS Coder (C2000 F28379D LaunchXL)
|
|
2
|
106
|
May 5, 2026
|
|
The parallel capacitance issue of the full-bridge LLC resonant converter model
|
|
1
|
152
|
April 23, 2026
|
|
Shoot-through in full-bridge inverter with RT Box and TI C2000 when using Switch block
|
|
1
|
96
|
April 20, 2026
|
|
Signal mismatch between RT Box Analog Out and DSP ADC in external mode
|
|
2
|
110
|
April 20, 2026
|
|
Peak current control of DAB on RT-Box
|
|
2
|
154
|
April 1, 2026
|
|
PWM Harmonic Spectrum: Analog and Digital Controllers Compared
|
|
0
|
808
|
March 27, 2026
|
|
PWM Modulator Delay: Analysis verified by PLECS
|
|
0
|
715
|
March 18, 2026
|
|
Request for Specific TSP Installation Files (STM32 v1.4.3 and TI v1.10.3)
|
|
1
|
96
|
March 9, 2026
|
|
CPU Overruns and CPU Usage - A Debugging Guide
|
|
0
|
277
|
February 23, 2026
|
|
Adjusting Sampling Time
|
|
4
|
145
|
February 20, 2026
|
|
Real-Time Implementation and HIL Validation of Dual-Ended Charge Control for LLC Converters in PLECS
|
|
0
|
668
|
February 9, 2026
|
|
Challenge modeling switch S3 in 4-Port DC-DC Converter on RT Box 1 (Sub-cycle Averaging issue)
|
|
3
|
983
|
December 10, 2025
|
|
Problems with application of ePWM block in Digital Control
|
|
7
|
1689
|
December 4, 2025
|
|
Sample time for task 0 on CPU 0 too small - raise sample time or system clock rate
|
|
1
|
656
|
December 3, 2025
|
|
How can I convert the analog circuitry of the frequency converter to C200 compatible mode (by burning it into the 28069M)?
|
|
5
|
1118
|
November 25, 2025
|
|
Static void Tasks(bool aInit, void * const aParam) , Question about the content of this function
|
|
8
|
1502
|
November 24, 2025
|
|
Help Creating load flow simulation for 3 phase powered commercial building
|
|
10
|
1029
|
November 7, 2025
|
|
Additional PWM - using XBAR inside Plecs Coder
|
|
1
|
565
|
November 3, 2025
|